processing...

Blog Details

June CP propane exchange $56-61/mt less than May term CP  | CP's June/July propane swap backwardation increases to $10-15/mt

June CP propane exchange $56-61/mt less than May term CP | CP's June/July propane swap backwardation increases to $10-15/mt

May 09, 2023

- June CP propane exchange $56-61/mt less than May term CP- CP's June/July propane swap
backwardation increases to $10-15/mt



The first month of CP propane was swapped
on 8 May at $513.5-533.10/mt. The FEI
propane heard at 5332.5-534/mt and the FEI/CP at $19.5/mt was equal to
$513.5/mt. The June CP swap was $41.5-46.15/mt lower than
the May term CP. The June/July CP Propane swaps backwardation was
$8/mt on May 8, down $2/mt compared to the previous session. Meanwhile, the
July/August CP Propane swaps structure had a contango of 50 cents/mt, compared
to parity during the previous session. VLGC rates
for the main Persian Gulf to Japan route were valued at $79.5-84.10/mt. This
was up $1.5-2.10/mt over the previous session. Shipping
brokerages said the East is experiencing a strong upward trend. The arbitrage is not particularly...

Exclusive market movement data, shipping lineups, demand signals and pricing rationale continue in full report.

Unlock complete article access with a paid account.

Continue Reading With Membership

This is a preview. Login and activate a paid plan to read the complete article.

Login to Continue