processing...

Blog Details

Sinopec Yanshan removes No. 3 PP unit from stream

Sinopec Yanshan removes No. 3 PP unit from stream

May 29, 2025

Sinopec Yanshan Petrochemical shut down its No.3 Polypropylene unit in Beijing. A source in China told a member of the team, "The company halted operation at the unit on 26 May 2025 for maintenance." The duration of the shutdown was not known. The No. 3 unit is located in Beijing, China and has a capacity of 280.000 mt/year.