processing...

Blog Details

Sinopec Tianjin carries out planned maintenance at PO plant

Sinopec Tianjin carries out planned maintenance at PO plant

May 08, 2025

Sinopec Tianjin shut down its Propylene Oxide (PO) Plant. Sources in China told a member of the team that "the plant was closed on May 6, 2025, for maintenance." The duration of the closure could not be determined. The PO plant in Tianjin has a capacity of 150,000mt/year.