processing...

Blog Details

Sinopec SABIC Tianjin completes planned turnaround at cracker

Sinopec SABIC Tianjin completes planned turnaround at cracker

Apr 23, 2025

Sinopec Sabic Tianjin shut down its cracker. A source in China told a member of the team, "The company started a maintenance turn-around at the cracker April 21, 2025." The duration of the shutdown was not known. The cracker is located in Tianjin (China) and has a ethylene production capability of 1.3 millions mt/year, as well as a propylene capacity of 690,000.