processing...

Blog Details

Petrokemya undertakes unplanned shutdown at SM plant

Petrokemya undertakes unplanned shutdown at SM plant

Jun 15, 2026

Petrokemya has taken its two Styrene monomer (SM) units offline last week. A source in Saudi Arabia informed a team member, “The company has halted operations at the plant in mid-January, 2026, owing to production issues. Further details on the duration of the shutdown could not be ascertained.” Located at Al Jubail, Saudi Arabia, the two units have a production capacity of No.1 570,000 mt/year and No.2 570,000 mt/year.