processing...

Blog Details

No. 2 VCM unit to be closed by LG Chem No. 2 VCM unit

No. 2 VCM unit to be closed by LG Chem No. 2 VCM unit

Apr 14, 2025

LG Chem will likely shut down its No. A source in South Korea told a member of the team that the company plans to close the unit by second half of 2025. The duration of the shut down was not specified. The 2 VCM has a capacity of 390,000.mt/year.