processing...

Blog Details

Fujia Dahua Petrochemical schedules maintenance at PX plant

Fujia Dahua Petrochemical schedules maintenance at PX plant

Jun 11, 2025

Fujia Dahua Petrochemical deferred its shutdown of the Paraxylene plant (PX) in Liaoning. Sources in China told a member of the team that "the company will perform maintenance at the plant by September 2025." Originally, the plant was scheduled to close in July 2025. The shutdown date and duration could not be determined.