processing...

Blog Details

FPCC resumes operations at No.1 RFCC unit

FPCC resumes operations at No.1 RFCC unit

Jun 16, 2026

Formosa Petrochemical Corp (FPCC) has restarted its No.1 residual fluid catalytic cracker (RFCC) unit in Mailiao. A source in Taiwan informed a team member, “The company has brought the unit on stream around November 6, 2025. The unit was shut for a maintenance turnaround.” Located in Mailiao, Taiwan, the No.1 RFCC unit has a propylene production capacity of 350,000 mt/year.