processing...

Blog Details

Carmel Olefins stops production at cracker

Carmel Olefins stops production at cracker

Jun 23, 2025

Carmel Olefins is no longer streaming its cracker at Haifa. Sources in Israel told a member of the team that "the company shut down the cracker on or around June 19, 2025." The duration of the shut down could not be determined. Located in Haifa (Israel), the cracker's ethylene production capacity is 240,000 mt/year, and its propylene production capability is 140,000 mt/year.